Project: KWSP Peladang Building AC Upgrade
(EPC-based air-conditioning enhancement at PPNK, Alor Setar)
We completely overhauled the chillers and distribution network under an Energy Performance Contract, delivering 20 % higher cooling capacity while guaranteeing cost-savings via performance-based incentives.


Project: FINAS Hulu Kelang AC System Overhaul
(comprehensive air-conditioning upgrade and ancillary M&E works)
Our team replaced aging rooftop units with high-efficiency chillers, rebalanced ductwork and modernized controls, achieving 15 % lower energy bills and improved indoor comfort.


Project: PETRONAS Tower 1 Refurbishment
(Levels 77–81 & 85; Level 74 fit-out)
We managed full M&E fit-out—new VRV systems, lighting retrofits and fire-alarm integration—across multiple floors while coordinating around live office operations to minimize downtime.


Project: Malaysia Airlines Simulator Building Fit-Out
(EV charging station and DCS tie-in)
In this specialized training facility, we installed dedicated HVAC zones, high-voltage EV chargers and a district-cooling connection, ensuring stable temperatures for sensitive avionics equipment.


Project: Menara Bank Pembangunan AC & BMS Retrofit
(centralized air-conditioning upgrade with building-management system)
We integrated a new BMS platform with fan-coil units and chilled-water loops, giving facility managers real-time control over temperature, airflow and energy use.


Project: Malaysia Airlines Academy VRF/VRV Retrofit
(VRF/VRV installation plus chilled-water integration)
Our scope included zoned heat-pump systems, networked controls and tie-in to the campus chilled-water plant, resulting in precise comfort control and 25 % lower cooling costs.


Project: CITIBANK Tower Renovation
(levels 29, 30, 31, 33, 38 & 46 fit-out and M&E refurbishment)


Project: AZRB Headquarters, Kuala Lumpur
(end-to-end mechanical & electrical design and installation)


Project: Khazanah Office at Mercu UEM
(design, supply, build, test & commission of new office M&E systems)


Project: Dubai Meydan Quarantine Stables
We engineered the full M&E fit-out for a high-security equine quarantine facility, specifying precision HVAC with controlled temperature, humidity and air-change rates, plus dedicated waste-water and ventilation systems to meet strict biosecurity standards. Our BIM-coordinated design ensured seamless integration with the surrounding resort infrastructure and delivered a turnkey solution that guarantees animal health and regulatory compliance.


Project: Dubai Falcon Commercial Park
We provided end-to-end M&E design for a mixed-use retail and office complex in Meydan City, including high-efficiency HVAC, advanced lighting schemes and a centralized Building Management System. Through value-engineering and detailed load analysis, we reduced projected energy consumption by 15 % and created a flexible electrical and mechanical backbone to support diverse tenant fit-outs.